Costain and P6 EPPM
Costain Group Uses Global Best Practices and Collaboration to Maintain Growth and Keep High-Profile Projects on Track.
The Costain Group, one of the United Kingdom’s leading construction and engineering companies, is at the forefront of the drive to develop and improve the nation’s infrastructure. In its targeted sectors, ranging from waste to transport, Costain plays a major role in the provision of new facilities.
Costain chose Oracle’s Primavera P6 EPPM to capture and standardize best practices with a single planning environment, backed by an enterprise project data repository.
Click here to read the full case study.

